| Process capability | Which processes can you perform in-house, such as CNC milling, turning, drilling, or 5-axis machining? | Process list, machine capability overview, and examples of comparable parts. | Confirm that the required operations, part envelope, and production volume fit the available equipment. | Ask which operations, if any, are subcontracted. |
| Material experience | Have you machined this material and its specified condition before? | Material certificates for sample or production parts, plus relevant machining references. | Verify the exact alloy or grade, temper or condition, and any required traceability. | A similar material is not always an equivalent substitute. |
| Dimensional capability | Can you hold the tolerances and geometric requirements shown on the drawing? | Inspection report or sample measurement results for comparable features. | Review critical dimensions individually; do not rely only on a general statement of achievable tolerance. | Tolerance capability depends on the feature, material, part size, and process. |
| Quality system | How are nonconforming parts, corrective actions, and document revisions controlled? | Quality-system certificate, inspection procedure, and a redacted example of a corrective-action record. | Check that the system is appropriate to the product and that certificates are current and verifiable. | Certification does not replace review of actual inspection practices. |
| Inspection equipment | How will critical dimensions and surface requirements be measured? | Equipment list, calibration records, and a sample dimensional inspection report. | Confirm that measurement methods suit the required features and that measuring equipment is calibrated. | Some complex geometry may require a coordinate measuring machine or a dedicated fixture. |
| Finishing and secondary operations | Can you manage specified finishing, heat treatment, deburring, or assembly? | Process details, finish specifications, and records identifying any approved subcontractors. | Confirm finish type, masking requirements, dimensional effects, and responsibility for final inspection. | Finishing processes can affect dimensions, appearance, and material properties. |
| Lead time and capacity | What are the quoted lead time, available capacity, and assumptions behind the schedule? | Written quotation with milestones, quantity assumptions, and stated production constraints. | Compare like-for-like quantities and delivery terms; ask how schedule changes are communicated. | Lead times vary with material availability, complexity, workload, and finishing. |
| Quotation clarity | Does the quote identify material, quantity, tolerances, finishing, inspection, and delivery terms? | Itemized quotation and a list of assumptions or exclusions. | Resolve unclear specifications and exclusions before placing an order. | A low initial price may omit inspection, tooling, finishing, or shipping costs. |
| Communication and engineering support | Who reviews drawings and raises questions about manufacturability or ambiguous requirements? | Sample technical question log, drawing-review process, and named project contact. | Look for clear, timely questions before production rather than assumptions about critical features. | Agree on the approved drawing revision and change-control process. |
| Packaging and delivery | How will parts be protected, identified, and shipped? | Packaging specification, labeling example, and delivery terms. | Match protection and identification to part fragility, cleanliness, traceability, and destination. | Specify packaging requirements before the order is released. |
| Confidentiality and file handling | How are drawings, CAD files, and other confidential information protected? | Confidentiality agreement, file-access procedure, and retention or deletion policy. | Confirm who can access files and how revisions and obsolete files are controlled. | Share only the information needed for quotation and production. |
| Trial order and supplier review | Can a representative first article or small trial batch be inspected before repeat production? | First-article inspection report, sample parts, and documented approval criteria. | Define acceptance criteria and approval responsibilities before starting the trial. | Use the trial to validate both the part and the supplier's communication and documentation. |