| Production Speed | Select a rated output that is at least 15–20% above the required sustained output. For many medium-to-high-speed diaper bagging lines, a practical target is approximately 80–150 bags per minute, depending on pack count and product size. | Request a witnessed production test using the actual diaper dimensions, pack count, film, and operating speed. | Rated maximum speed may be higher than the stable production speed achieved during continuous operation. |
| Counting Accuracy | Target at least 99.5% pack-count accuracy under stable feeding conditions; high-volume applications should evaluate whether 99.8% or better is achievable. | Run a statistically meaningful trial, record under-counts and over-counts separately, and inspect the count sensor, encoder, and reject logic. | Incorrect counts create customer complaints, rework, material loss, and possible compliance issues. |
| Counting Technology | Use synchronized photoelectric sensors, servo-controlled feeding, and an electronic counting system with recipe-based settings. | Check sensor response, product-spacing control, count memory, alarm records, and automatic rejection of incomplete packs. | Accurate detection and synchronized motion reduce missed counts when products overlap or vary slightly in thickness. |
| Sealing Quality | The seal should be continuous, clean, and free from wrinkles, burn-through, open corners, and contamination. Seal strength must be validated for the selected polyethylene or co-extruded film. | Perform visual inspection, leak or burst testing where applicable, and seal-strength testing under normal and worst-case temperature and speed settings. | Weak or inconsistent seals can cause pack opening, product contamination, and transport damage. |
| Temperature Control | Use independent temperature control for sealing zones, with adjustable parameters and over-temperature protection. Temperature stability should be checked during continuous operation. | Compare the displayed temperature with an external calibrated measuring device and review temperature alarms during a production trial. | Stable heat reduces seal variation when film thickness, ambient temperature, or line speed changes. |
| Film Compatibility | The machine should support the intended film type, width, thickness range, roll diameter, and printing or registration requirements stated in the technical specification. | Test the exact packaging film and confirm web tension, tracking, roll loading, registration accuracy, and film-change procedure. | A machine optimized for one film structure may produce wrinkles or unstable seals with another structure. |
| CE Marking | For machinery supplied to the European Economic Area, require a valid CE conformity process, Declaration of Conformity, risk assessment, technical documentation, and operating instructions in the required languages. | Verify the machine nameplate, Declaration of Conformity, applicable EU legislation, safety circuits, guards, emergency stops, and technical file availability. | CE marking indicates that the manufacturer declares conformity with applicable EU requirements; it is not a substitute for checking machine safety. |
| Safety System | The machine should include interlocked guards, accessible emergency stops, safe access to heated areas, overload protection, and controlled restart after a safety trip. | Carry out a documented safety-function test and confirm that opening a guard stops hazardous motion as intended. | Safety controls protect operators during film loading, cleaning, adjustment, and fault recovery. |
| ISO 9001 Quality System | Prefer a supplier with a current ISO 9001 certificate issued by an accredited certification body and a documented quality-management scope covering machine design or manufacturing. | Check certificate validity, certification scope, issuing body, audit status, traceability procedures, nonconformity handling, and final inspection records. | ISO 9001 supports consistent processes, corrective action, document control, and traceable quality management. |
| Changeover Time | A well-designed line should provide tool-less or quick-adjust settings where practical. A typical target for a routine size or count change is approximately 15–30 minutes after operator training. | Time the changeover using the required format, count, film, and operator procedure; include cleaning and first-article approval. | Shorter changeovers improve equipment utilization and reduce material waste between production orders. |
| Automatic Rejection | The system should detect and reject under-counted, over-counted, unsealed, or incorrectly positioned packs without stopping the entire line whenever feasible. | Test each fault type independently and confirm that rejected products cannot be mixed with accepted products. | Reliable rejection protects finished-product quality while maintaining high throughput. |
| Control and Data Records | Use a PLC/HMI system with password-protected recipes, production counters, alarm history, downtime records, and data-export capability where required. | Review user permissions, recipe recovery, alarm timestamps, counter accuracy, and compatibility with the plant data system. | Recorded data supports troubleshooting, production analysis, quality investigations, and operator accountability. |
| Maintenance and Spare Parts | Require preventive-maintenance schedules, electrical and pneumatic diagrams, recommended spare-parts lists, troubleshooting guides, and remote or on-site technical support. | Ask for lead times for critical parts such as sensors, heaters, belts, cutting blades, sealing components, and drive elements. | Clear maintenance documentation reduces downtime and helps operators restore production safely. |
| Acceptance Criteria | Define measurable limits before purchase, including sustained speed, count accuracy, seal quality, reject rate, changeover time, noise, and safety-function performance. | Include the criteria in the FAT and SAT documents and approve the machine only after the agreed tests are passed. | Clear acceptance criteria prevent disputes and ensure that the purchased machine meets actual production needs. |